Anthony Giordano, Author at Strong Expansion Project /adv/strong-expansion-project/author/agiorda4/ Fri, 20 Mar 2026 14:18:17 +0000 en-US hourly 1 https://wordpress.org/?v=6.9.4 /adv/strong-expansion-project/wp-content/uploads/2026/04/cropped-favicon_strong_expansion-32x32.png Anthony Giordano, Author at Strong Expansion Project /adv/strong-expansion-project/author/agiorda4/ 32 32 New views from the inside out /adv/strong-expansion-project/new-views-from-the-inside-out/ Fri, 20 Mar 2026 14:10:04 +0000 /adv/strong-expansion-project/?p=7212 The project is now in Phase 1A, which includes detailed, collaborative transition planning—but also significant buildout of the mechanical floor and interior through April 2027. Check out the latest updates after a walk through the heart of the building.

The post New views from the inside out appeared first on Strong Expansion Project.

]]>
Structural steel taking shape /adv/strong-expansion-project/structural-steel-taking-shape/ Mon, 20 Jan 2025 19:21:49 +0000 /adv/strong-expansion-project/?p=5362 It’s hard to miss the visible signs of our expanded Emergency Department and in-patient pavilion. Driving past, you can now see the framework for three floors rising up from the ground. Despite winter conditions, crews are working hard to meet critical project milestones.

The post Structural steel taking shape appeared first on Strong Expansion Project.

]]>
Arrival of crane marks project milestone /adv/strong-expansion-project/arrival-of-crane-marks-project-milestone/ Wed, 04 Sep 2024 19:07:47 +0000 /adv/strong-expansion-project/?p=5602 A major step forward for the Strong Expansion Project arrived on September 6, 2024. A free-standing static tower crane was erected on a prebuilt foundation within the construction site. The tower has a horizontal boom with a 360° rotation for moving assembled construction materials onto the new building and its foundation as it is constructed.

The post Arrival of crane marks project milestone appeared first on Strong Expansion Project.

]]>
Amid winter temps, construction crews keep work moving /adv/strong-expansion-project/amid-winter-temps-construction-crews-keep-work-moving/ Wed, 24 Jan 2024 20:12:38 +0000 /adv/strong-expansion-project/?p=5652 Our construction site continues to buzz with activity as crews continue excavation and installation of sheet piles. They have begun pouring concrete for the future building's foundation which will continue in the coming months.

The post Amid winter temps, construction crews keep work moving appeared first on Strong Expansion Project.

]]>